What the work actually involves, in what order, and how to tell a good contractor from a confident one.

Start here: decide whether your layout is changing before you do anything else. That single decision sets your budget band, your timeline, whether you need permits, and which contractors are even the right ones to call.

Three scopes, and how to know which one you need

1. Cosmetic refresh — nothing moves, cabinets stay

New countertops, backsplash, hardware, lighting, paint, and appliances. Cabinet boxes remain; doors and drawer fronts may be replaced or refinished. Nothing structural, nothing mechanical.

Right for you if the layout works, the cabinets are structurally sound, and what you dislike is how it looks. Common in homes built after roughly 2010, and more common than people expect in 1990s homes where the cabinet boxes have held up well.

2. Full remodel, existing layout

New cabinets, counters, flooring, lighting, and appliances — but the sink, range, and refrigerator stay in their current positions. Electrical may be upgraded in place. No walls move.

Right for you if the kitchen is genuinely dated or worn out but the floor plan itself is fine. This is the most common project in this county and it’s where the cost-to-result ratio is best.

3. Full remodel with layout change

Relocating the sink, range, or refrigerator. Removing or opening a wall. Adding or resizing an island. This brings in plumbing, gas, electrical, sometimes structural engineering, and permits.

Right for you if the actual problem is the floor plan — a closed-off kitchen, a bad work triangle, no room for more than one person. Worth doing properly if that’s the real complaint, because finishes won’t fix a layout.

The sequence of work

  1. Design and measurement. Final layout, cabinet specification, appliance selections. Nothing should be ordered until measurements are verified on site.
  2. Cabinet order. Almost always the longest lead time. Semi-custom and custom are frequently quoted in months. Demolition should not begin until the cabinets are confirmed and dated.
  3. Permits, if the scope requires them. Requirements differ between Georgetown, Round Rock, and Cedar Park.
  4. Demolition. Fast, loud, and the point at which surprises surface in older homes.
  5. Rough-in. Plumbing, gas, and electrical by separately licensed trades. Inspections here if permitted.
  6. Drywall, paint, flooring.
  7. Cabinet install, then countertop templating — counters are measured off installed cabinets, not drawings, which is why this order matters and why there’s a gap of a week or more here.
  8. Countertop install, backsplash, plumbing and electrical trim, appliances.
  9. Punch list. Budget real time for this. It's where a good contractor is distinguishable from an adequate one.

The gap that surprises everyone

Countertops are templated after cabinets are installed, then fabricated, then delivered. That's typically 1–2 weeks with no sink and no usable counter. It is not a delay and it is not your contractor stalling — it’s how the trade works. Plan to eat elsewhere.

How to vet a remodeler in Texas

Texas does not license general contractors or remodelers. There is no state board, no license number to look up, and no regulatory body that will help you if the job goes badly. That is a meaningful difference from most states and it changes how you should evaluate people.

What actually protects you:

That last one is worth understanding before you start rather than after.

Common local situations

Opening a wall to the living room

The most requested change in 1990s and 2000s floor plans. Whether it's straightforward or expensive depends entirely on whether the wall is load-bearing. If it is, you're adding a beam, likely an engineer's involvement, and permits. Get that assessed before you set a budget — the answer changes the number by tens of thousands.

Electrical in older homes

Kitchens built in the 1990s frequently have fewer dedicated circuits than modern appliance loads and current code require. A full remodel in a home of that era often includes electrical upgrades that weren’t in the original budget. Better to hear it at the quote stage than at rough-in.

HOA neighborhoods

Interior work generally doesn’t need HOA approval in Sun City, Wolf Ranch, Teravista, Berry Creek, or Forest Creek — but anything affecting the exterior can, including new exterior venting for a range hood. Worth a five-minute check with your association before the design is final.